Construction of Interim Spent Fuel Storage Facility (B1):

  • Building Management System (BMS)
    • Preparation of Detail Design
    • Manufacturing of control and power cabinets
    • Installation and start-up
    • Acceptance testing
    • Commissioning
  • Installation of main equipment
    • Electrical equipment
    • Automation equipment
  • Start-up of main equipment
    • Technological equipment
    • Electrical equipment
    • Automation and control systems of technological equipment
  • Acceptance testing
  • Cold and hot run tests
  • Commissioning