by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Modernization of Safety Parameters Display System, Ignalina NPP, Unit 2.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Upgrade of the personal time accounting system “ALGA 2007”.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Development of information system for control of technological channels overload parameters.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Development of information system for nuclear material actual charge (taking into account spent fuel).

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

JSC „GRIGIŠKĖS“

Modernization of JSC „GRIGIŠKĖS“ gas boiler house control system.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Temperature and rarefaction control system, Unit 1 INPP -Design, development and commissioning.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Ignalina Nuclear Power Plant

Building management system (BMS) for „Landfill“ facility for short-lived very low level waste Ignalina NPP (B19) (Development, Installation, setup, acceptance testing and commissioning).

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)

Modernization of control system of pump house № 25 of petroleum refinery Public company „ORLEN Lietuva“. Design, replacement of current controllers to Siemens controllers, programming, mounting, commissioning.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Nukem Technologies. Ignalina Nuclear Power Plant

Construction of Interim Spent Fuel Storage Facility (B1):

  • Building Management System (BMS)
    • Preparation of Detail Design
    • Manufacturing of control and power cabinets
    • Installation and start-up
    • Acceptance testing
    • Commissioning
  • Installation of main equipment
    • Electrical equipment
    • Automation equipment
  • Start-up of main equipment
    • Technological equipment
    • Electrical equipment
    • Automation and control systems of technological equipment
  • Acceptance testing
  • Cold and hot run tests
  • Commissioning