Ignalina Nuclear Power Plant

Solid Radioactive Waste Treatment and Management Facilities (B34):

  • Radiation monitoring and tracking system
    • Development of installation design
    • Equipment procurement
  • Installation and start-up/commissioning
by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Fuel storage depot of JSC „Lithuanian Railways“

Construction of Radviliškis Fuel storage depot of JSC „Lithuanian Railways“ fuel storage depots management centre: mounting, adjustment, commissioning of automation and power supply systems, fire alarm and security alarm systems, communication and video surveillance systems, supply of equipment (PC, controllers, sensors, control cabinets).

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

JSC „Visagino linija”

Design, development, installation and commissioning of electric power accounting system for furniture factory JSC „Visagino linija”.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Nukem Technologies. Ignalina Nuclear Power Plant.

Construction of Solid Radioactive Waste Treatment and Management Facilities (B34):

  • Preparation of tie-in design (installation design)
  • Installation and start-up/commissioning of electrical equipment
  • Programming and start-up of control systems
  • Acceptance testing
  • Commissioning
by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Nukem Technologies. Ignalina Nuclear Power Plant.

Construction of New Solid Radioactive Waste Retrieval Facility (B2) LSF & RU1, RU2-RU3:

  • Preparation of technical documentation
  • Programming of PLC and SCADA
  • Installation
    • Electrical equipment
    • Automation
  • Start-up
    • Technological equipment
    • Electrical equipment
    • Automation and control systems of technological equipment
  • Acceptance testing
  • Cold and hot run tests
  • Commissioning
by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

JSC „Orion Global PET“

Design, development, installation and commissioning of the processes control system of thermo-oil boiler plant (with combined fuel: gas and biofuel) in JSC „Orion Global PET“.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

JSC „Klaipėdos nafta”

Modernization of hydrocarbon steam utilization system of Klaipeda oil terminal JSC „Klaipėdos nafta”.

Design, development, installation and commissioning process control systems.

by Simon Boots Simon Boots /var/www/vhosts/bis.lt/httpdoc/wp-content/themes/factory/content.php

Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)

Repair and modernization of technological equipment of automation and electrical parts:

  • Heating of control and measuring apparatus LT4707 of tank 10T-2 at the sulfur facility № 2.
  • Modification of separator SP-308 of oligomerization block at the facility №1 of complex LK-1.
  • Replacement of current ultrasonic flow meter by new measuring instrument at the fuel oil processing combined facility.
  • Supply of valve with pneumatic drive XV-1291.
  • Supply of positioners S-100 PST at valves with pneumatic drive of furnace KR-101 of complex GP-1 LK-2.
  • Replacement of old relay circuits of facility № 2 for compressors SK-301, 302, 303, 304.
  • Switching of technological parameters indication of facility № 2 from operator control panel to automatic control system.

The scope of works includes design, development, installation and commissioning.