by Simon Boots Simon Boots

Repair and modernization of technological equipment of automation and electrical parts:

  • Heating of control and measuring apparatus LT4707 of tank 10T-2 at the sulfur facility № 2.
  • Modification of separator SP-308 of oligomerization block at the facility №1 of complex LK-1.
  • Replacement of current ultrasonic flow meter by new measuring instrument at the fuel oil processing combined facility.
  • Supply of valve with pneumatic drive XV-1291.
  • Supply of positioners S-100 PST at valves with pneumatic drive of furnace KR-101 of complex GP-1 LK-2.
  • Replacement of old relay circuits of facility № 2 for compressors SK-301, 302, 303, 304.
  • Switching of technological parameters indication of facility № 2 from operator control panel to automatic control system.

The scope of works includes design, development, installation and commissioning.