Reference list of key projects
You can also download the list in following languages: English
-
Customer:Description:
-
Customer: NNEGC “Energoatom”Ukraine, 2019-2020
Design, development and commissioning of Turbine control and interlock systems at Chmelnickaja Unit 1 and Unit 2, Uzhnoukrainskaja Unit 1 NPP.
Safety Upgrade Programs of Nuclear Power Plants (EBRD bank).
-
Customer: JSC «Rusatom Automated Control Systems»Bangladesh, 2019-2020
Design, development and commissioning Chemistry water monitoring at Ruppoor Nuclear Power plant Unit 1 and Unit 2.
-
Customer: Regional Utility Production Company “Dnipro-Kirovohrad”Ukraine, 2018-2020
Design, supply and installation of Automation and Telemetry system including SCADA, GIS.
World Bank Project .
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2019
Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 4.
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2019
Design, development and commissioning upgrade of SCADA and control system in thermal power plant of Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).
-
Customer: OÜ „VKG ENERGIA“Estonia, 2019
Organization of flue gases accounting before sulfur removal facilities NID-1, NID-2 in Northern Thermal Power Plant of OÜ „VKG ENERGIA“.
Preparing of technical design and detailed design, supply and mounting of equipment, SCADA/PLC programming, adjustment, preparing of turn-over and as-built documentation.
-
Customer: NNEGC “Energoatom”Ukraine, 2019
Supply of Electric motors 0.4 kV for modernization of containment cooling system fans for SS RNPP, KhNPP, SUNPP.
Safety Upgrade Programs of Nuclear Power Plants (EBRD bank).
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2019
Design, development, installation and commissioning of process control/automation and electrical parts for control of supply liquified petroleum gas (LPG) (butane) to thermal power plant of Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).
-
Customer: Armenian NPPArmenia, 2017-2019
Design, development and commissioning of control system for 125/20 tons cranes for Armenian NPP Unit 2.
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2018
Development and implementation of the data exchange interface between ASRK (radiation monitoring) and plant Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit .
-
Customer: JSC „Visagino linija”Lithuania, 2018
Design, development, installation and commissioning - Quality control system of drilling on conveyor line for drawers manufacturing at furniture producing factory JSC „Visagino linija” („SBA” concern).
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2018
Design, development, installation and commissioning of automatic sampling facility of industrial wastewater discharge into the environment.
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2018
Design, development, installation and commissioning of the Upgrade of control panels for gas compressors IK-201, IK-301 in Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2018
Design, development, installation and commissioning of duplicated level meters in Public company „ORLEN Lietuva“ (Mazeikiai petroleum refinery).
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2017-2018
Repair and modernization of technological equipment of automation and electrical parts:
- Heating of control and measuring apparatus LT4707 of tank 10T-2 at the sulfur facility № 2.
- Modification of separator SP-308 of oligomerization block at the facility №1 of complex LK-1.
- Replacement of current ultrasonic flow meter by new measuring instrument at the fuel oil processing combined facility.
- Supply of valve with pneumatic drive XV-1291.
- Supply of positioners S-100 PST at valves with pneumatic drive of furnace KR-101 of complex GP-1 LK-2.
- Replacement of old relay circuits of facility № 2 for compressors SK-301, 302, 303, 304.
- Switching of technological parameters indication of facility № 2 from operator control panel to automatic control system.
The scope of works includes design, development, installation and commissioning.
-
Customer: Balakovo Nuclear Power PlantRussia, 2014-2018
Design, development and commissioning replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 3.
-
Customer:Description:
-
Customer: LLC «GE Rus»Russia, 2017
Organization of training seminars regarding General Electric (GE) equipment.
-
Customer: JSC “Mozyr Oil Refinery”Belarus, 2017
Modernization of emergency shutdown system - replacement of the TRICONEX control system (Design, development, installation and commissioning).
-
Customer: Balakovo Nuclear Power PlantRussia, 2017
Modernization of Computerized Information System and Safety Parameter Display System (SPDS) for the implementation of the impulse discharge system for turbines K-1000-60 / 1500-2 at Balakovo NPP, units 1, 2, 4.
-
Customer: Armenian NPPArmenia, 2017
Design, development, installation and commissioning of automation system for test bench of shock absorbers of Armenian NPP.
-
Customer: JSC „Klaipėdos nafta”Lithuania, 2016-2017
Modernization of hydrocarbon steam utilization system of Klaipeda oil terminal JSC „Klaipėdos nafta”.
Design, development, installation and commissioning process control systems.
-
Customer: OÜ „VKG ENERGIA“Estonia, 2015-2017
Design, development, installation and commissioning electrical and process control system for Сonstruction of steam-gas power boiler №4 in Kohtla-Järve.
-
Customer: Nukem Technologies. Ignalina Nuclear Power Plant.Lithuania, 2014-2017
Construction of New Solid Radioactive Waste Retrieval Facility (B2) LSF & RU1, RU2-RU3:
- Preparation of technical documentation
- Programming of PLC and SCADA
- Installation
- Electrical equipment
- Automation
- Start-up
- Technological equipment
- Electrical equipment
- Automation and control systems of technological equipment
- Acceptance testing
- Cold and hot run tests
- Commissioning
-
Customer: Balakovo Nuclear Power PlantRussia, 2017
Design, development and commissioning of plant Computerized Information system and Safety Parameter Display System (SPDS) for Unit 4 of Balakovo NPP.
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2016
Design, development, installation and commissioning of leakage monitoring system for Balakovo NPP, unit 3,4.
-
Customer: JSC „Orion Global PET“Lithuania, 2015-2016
Design, development, installation and commissioning of the processes control system of thermo-oil boiler plant (with combined fuel: gas and biofuel) in JSC „Orion Global PET“.
-
Customer: Nukem Technologies. Ignalina Nuclear Power Plant.Lithuania, 2014-2016
Construction of Solid Radioactive Waste Treatment and Management Facilities (B34):
- Preparation of tie-in design (installation design)
- Installation and start-up/commissioning of electrical equipment
- Programming and start-up of control systems
- Acceptance testing
- Commissioning
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2013-2015
Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 2.
-
Customer: Balakovo Nuclear Power PlantRussia, 2012-2015
Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 1.
-
Customer: Nukem Technologies. Ignalina Nuclear Power PlantLithuania, 2012-2015
Construction of Interim Spent Fuel Storage Facility (B1):
- Building
Management System (BMS)
- Preparation of Detail Design
- Manufacturing of control and power cabinets
- Installation and start-up
- Acceptance testing
- Commissioning
- Installation
of main equipment
- Electrical equipment
- Automation equipment
- Start-up
of main equipment
- Technological equipment
- Electrical equipment
- Automation and control systems of technological equipment
- Acceptance testing
- Cold and hot run tests
- Commissioning
- Building
Management System (BMS)
-
Customer:Description:
-
Customer: JSC „Visagino linija”Lithuania, 2014
Design, development, installation and commissioning of electric power accounting system for furniture factory JSC „Visagino linija”.
-
Customer: Fuel storage depot of JSC „Lithuanian Railways“Lithuania, 2013-2014
Construction of Radviliškis Fuel storage depot of JSC „Lithuanian Railways“ fuel storage depots management centre: mounting, adjustment, commissioning of automation and power supply systems, fire alarm and security alarm systems, communication and video surveillance systems, supply of equipment (PC, controllers, sensors, control cabinets).
-
Customer: Ignalina Nuclear Power PlantLithuania, 2013-2014
Solid Radioactive Waste Treatment and Management Facilities (B34):
- Radiation
monitoring and tracking system
- Development of installation design
- Equipment procurement
- Installation and start-up/commissioning
- Radiation
monitoring and tracking system
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2012-2013
Replacement of equipment for automated control system for turbine ASUT-1000 for Unit 1 of Balakovo NPP (First stage): Data exchange system development.
-
Customer: Armenian NPPArmenia, 2012-2013
Design, development and commissioning Computerized Information System (CIS) for basic function simulator for Armenia NPP.
-
Customer: Balakovo Nuclear Power PlantRussia, 2012-2013
Design, development and commissioning of plant Computerized Information system and Safety Parameter Display System (SPDS) for Unit 3 of Balakovo NPP.
-
Customer: Armenian NPPArmenia, 2010-2013
Design, development and commissioning of the Remote Shutdown Panel and Post Accident Monitoring System for Armenian NPP, Unit 2.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2010-2012
Building management system (BMS) for „Landfill“ facility for short-lived very low level waste Ignalina NPP (B19) (Development, Installation, setup, acceptance testing and commissioning).
-
Customer: Ignalina Nuclear Power PlantLithuania, 2010-2012
Temperature and rarefaction control system, Unit 1 INPP -Design, development and commissioning.
-
Customer: Kursk and Kalinin Nuclear Power PlantRussia, 2008-2012
Design, development and commissioning of nuclear material accountancy and control system at Kursk and Kalinin NPPs.
-
Customer: Smolensk Nuclear Power PlantRussia, 2007-2012
Design, development and commissioning of process control system for the new Radwaste Treatment Facility at Smolensk NPP Lot 3.
EuropeAid/124373/D/SUP/RU
-
Customer:Description:
-
Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)Lithuania, 2010-2011
Modernization of control system of pump house № 25 of petroleum refinery Public company „ORLEN Lietuva“. Design, replacement of current controllers to Siemens controllers, programming, mounting, commissioning.
-
Customer: Balakovo Nuclear Power PlantRussia, 2003-2011
Development and supply of Computerized Information System and Safety Parameter Display System (SPDS) for Units 1 and 2 of Balakovo NPP.
-
Customer:Description:
-
Customer: Balakovo Nuclear Power PlantRussia, 2010
Integration of upgraded protection control system with Computerized Information Computing System (ICS) and of Safety Parameter Display System (SPDS), Balakovo Unit 1.
Design, development and commissioning.
-
Customer: Balakovo Nuclear Power PlantRussia, 2010
Integration of upgraded protection control system with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 2.
Design, development and commissioning.
-
Customer: Balakovo Nuclear Power PlantRussia, 2009-2010
Integration of the in-core control system (ICS) with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 1.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2007-2010
Ignalina NPP automated radiation monitoring system upgrade.
-
Customer:Description:
-
Customer: JSC „GRIGIŠKĖS“Lithuania, 2008-2009
Modernization of JSC „GRIGIŠKĖS“ gas boiler house control system.
-
Customer: Balakovo Nuclear Power PlantRussia, 2008-2009
Integration of the in-core control system (ICS) with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 2.
-
Customer: Balakovo Nuclear PowerRussia, 2006-2009
Development and supply of Leakage Monitoring System for Balakovo NPP, Unit 1.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2008
Development of information system for nuclear material actual charge (taking into account spent fuel).
-
Customer: Ignalina Nuclear Power PlantLithuania, 2008
Development of information system for control of technological channels overload parameters.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2008
Upgrade of the personal time accounting system “ALGA 2007”.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2007-2008
Modernization of Safety Parameters Display System, Ignalina NPP, Unit 2.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2006-2008
Automatization of INPP radiation laboratory. Accounting of radiological measurements and research.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2005-2008
Development of working time accounting system (DLADUAS).
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2007
Development of information system for automatic processing of measurement results of reactor's physical and dynamic characteristics.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2007
Upgrade of software of registration of malfunctions of physical safety system for Ignalina NPP.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2006-2007
Development and supply of Leakage Monitoring System in sealed rooms for Ignalina NPP Unit 2.
-
Customer: Leningrad Nuclear Power PlantRussia, 2003-2007
Modernization of Simulator, conceptual design of Control Room Panels (CRP), Leningrad NPP.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2005-2006
Development of equipment configuration control algorithms and automated system for Ignalina NPP Unit 2.
-
Customer: Ignalina Nuclear Power PlantLithuania, 2003-2006
Design, development and commissioning of Automatic Radiation Safety Monitoring System, Ignalina NPP.
-
Customer:Description:
-
Customer: Kalinin Nuclear Power PlantRussia, 2002-2004
Design, development and commissioning of Computerized Information/Safety Panel (CI/SP) system and associated connection to Crisis Centre (local-national), Kalinin NPP, Unit 2.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2001-2003
Modernization of the full scope Simulator, Ignalina NPP.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2000-2002
Design, development and commissioning Safety Parameters Display System, Ignalina NPP, Unit 2.
-
Customer:Description:
-
Customer: Ignalina Nuclear Power PlantLithuania, 2000-2001
Design, development and commissioning of Computer Information System TITAN, Ignalina NPP, Unit 2.