Projects

Reference list of key projects

You can also download the list in following languages: English

    2020
  • Customer:
    Description:
  • Customer: NNEGC “Energoatom”
    Ukraine, 2019-2020

    Design, development and commissioning of Turbine control and interlock systems at Chmelnickaja Unit 1 and Unit 2, Uzhnoukrainskaja Unit 1 NPP.

    Safety Upgrade Programs of Nuclear Power Plants (EBRD bank).

  • Customer: JSC «Rusatom Automated Control Systems»
    Bangladesh, 2019-2020

    Design, development and commissioning Chemistry water monitoring  at Ruppoor Nuclear Power plant Unit 1 and Unit 2.

  • Customer: Regional Utility Production Company “Dnipro-Kirovohrad”
    Ukraine, 2018-2020

    Design, supply and installation of Automation and Telemetry system including SCADA, GIS.

    World Bank Project .

  • 2019
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2019

    Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for  Balakovo NPP Unit 4.

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2019

    Design, development and commissioning upgrade of SCADA and control system in thermal power plant of Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).

  • Customer: OÜ „VKG ENERGIA“
    Estonia, 2019

    Organization of flue gases accounting before sulfur removal facilities NID-1, NID-2 in Northern Thermal Power Plant of OÜ „VKG ENERGIA“. 

    Preparing of technical design and detailed design, supply and mounting of equipment, SCADA/PLC programming, adjustment, preparing of turn-over and as-built documentation.

  • Customer: NNEGC “Energoatom”
    Ukraine, 2019

    Supply of Electric motors 0.4 kV for modernization  of containment cooling system fans for SS RNPP, KhNPP, SUNPP.

    Safety Upgrade Programs of Nuclear Power Plants (EBRD bank).

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2019

    Design, development, installation and commissioning  of process control/automation and electrical parts for control of supply liquified petroleum gas (LPG) (butane) to thermal power plant of Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).

  • Customer: Armenian NPP
    Armenia, 2017-2019

    Design, development and commissioning of control system for 125/20 tons cranes for Armenian NPP Unit 2.

  • 2018
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2018

    Development  and implementation of the data exchange interface between ASRK (radiation monitoring) and plant Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for  Balakovo NPP Unit .

  • Customer: JSC „Visagino linija”
    Lithuania, 2018

    Design, development, installation and commissioning - Quality control system of drilling on conveyor line for drawers manufacturing at furniture producing factory JSC „Visagino linija” („SBA” concern).

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2018

    Design, development, installation and commissioning of automatic sampling facility of industrial wastewater discharge into the environment.

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2018

    Design, development, installation and commissioning of the Upgrade of control panels for gas compressors IK-201, IK-301 in Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery).

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2018

    Design, development, installation and commissioning of duplicated level meters in Public company „ORLEN Lietuva“ (Mazeikiai petroleum refinery).

  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2017-2018

    Repair and modernization of technological equipment of automation and electrical parts:

    • Heating of control and measuring apparatus LT4707 of tank 10T-2 at the sulfur facility № 2.
    • Modification of separator SP-308 of oligomerization block at the facility №1 of complex LK-1.
    • Replacement of current ultrasonic flow meter by new measuring instrument at the fuel oil processing combined facility.
    • Supply of valve with pneumatic drive XV-1291.
    • Supply of positioners S-100 PST at valves with pneumatic drive of furnace KR-101 of complex GP-1 LK-2.
    • Replacement of old relay circuits of facility № 2 for compressors SK-301, 302, 303, 304.
    • Switching of technological parameters indication of facility № 2 from operator control panel to automatic control system.

    The scope of works includes design, development, installation and commissioning.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2014-2018

    Design, development and commissioning replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 3.

  • 2017
  • Customer:
    Description:
  • Customer: LLC «GE Rus»
    Russia, 2017

    Organization of training seminars regarding General Electric (GE) equipment.

  • Customer: JSC “Mozyr Oil Refinery”
    Belarus, 2017

    Modernization of emergency shutdown system - replacement of the TRICONEX control system (Design, development, installation and commissioning).

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2017

    Modernization of Computerized Information System and Safety Parameter Display System (SPDS) for the implementation of the impulse discharge system for turbines K-1000-60 / 1500-2 at Balakovo NPP, units 1, 2, 4.

  • Customer: Armenian NPP
    Armenia, 2017

    Design, development, installation and commissioning of automation system for test bench of shock absorbers of Armenian NPP.

  • Customer: JSC „Klaipėdos nafta”
    Lithuania, 2016-2017

    Modernization of hydrocarbon steam utilization system of Klaipeda oil terminal JSC „Klaipėdos nafta”.

    Design, development, installation and commissioning process control systems.

  • Customer: OÜ „VKG ENERGIA“
    Estonia, 2015-2017

    Design, development, installation and commissioning electrical and process control system for Сonstruction of steam-gas power boiler №4 in Kohtla-Järve.

  • Customer: Nukem Technologies. Ignalina Nuclear Power Plant.
    Lithuania, 2014-2017

    Construction of New Solid Radioactive Waste Retrieval Facility (B2) LSF & RU1, RU2-RU3:

    • Preparation of technical documentation
    • Programming of PLC and SCADA
    • Installation
      • Electrical equipment
      • Automation
    • Start-up
      • Technological equipment
      • Electrical equipment
      • Automation and control systems of technological equipment
    • Acceptance testing
    • Cold and hot run tests
    • Commissioning
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2017

    Design, development and commissioning of plant Computerized Information system and Safety Parameter Display System (SPDS) for Unit 4 of Balakovo NPP.

  • 2016
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2016

    Design, development, installation and commissioning of leakage monitoring system for Balakovo NPP, unit 3,4.

  • Customer: JSC „Orion Global PET“
    Lithuania, 2015-2016

    Design, development, installation and commissioning of the processes control system of thermo-oil boiler plant (with combined fuel: gas and biofuel) in JSC „Orion Global PET“.

  • Customer: Nukem Technologies. Ignalina Nuclear Power Plant.
    Lithuania, 2014-2016

    Construction of Solid Radioactive Waste Treatment and Management Facilities (B34):

    • Preparation of tie-in design (installation design)
    • Installation and start-up/commissioning of electrical equipment
    • Programming and start-up of control systems
    • Acceptance testing
    • Commissioning
  • 2015
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2013-2015

    Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 2.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2012-2015

    Design, development and commissioning - replacement of data acquisition system КСО of Computerized Information System (CIS) and Safety Parameter Display System (SPDS) for Balakovo NPP Unit 1.

  • Customer: Nukem Technologies. Ignalina Nuclear Power Plant
    Lithuania, 2012-2015

    Construction of Interim Spent Fuel Storage Facility (B1):

    • Building Management System (BMS)
      • Preparation of Detail Design
      • Manufacturing of control and power cabinets
      • Installation and start-up
      • Acceptance testing
      • Commissioning
    • Installation of main equipment
      • Electrical equipment
      • Automation equipment
    • Start-up of main equipment
      • Technological equipment
      • Electrical equipment
      • Automation and control systems of technological equipment
    • Acceptance testing
    • Cold and hot run tests
    • Commissioning
  • 2014
  • Customer:
    Description:
  • Customer: JSC „Visagino linija”
    Lithuania, 2014

    Design, development, installation and commissioning of electric power accounting system for furniture factory JSC „Visagino linija”.

  • Customer: Fuel storage depot of JSC „Lithuanian Railways“
    Lithuania, 2013-2014

    Construction of Radviliškis Fuel storage depot of JSC „Lithuanian Railways“ fuel storage depots management centre: mounting, adjustment, commissioning of automation and power supply systems, fire alarm and security alarm systems, communication and video surveillance systems, supply of equipment (PC, controllers, sensors, control cabinets).

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2013-2014

    Solid Radioactive Waste Treatment and Management Facilities (B34):

    • Radiation monitoring and tracking system
      • Development of installation design
      • Equipment procurement
    • Installation and start-up/commissioning
  • 2013
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2012-2013

    Replacement of equipment for automated control system for turbine ASUT-1000 for Unit 1 of Balakovo NPP (First stage): Data exchange system development.

  • Customer: Armenian NPP
    Armenia, 2012-2013

    Design, development and commissioning Computerized Information System (CIS) for basic function simulator for Armenia NPP.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2012-2013

    Design, development and commissioning of plant Computerized Information system and Safety Parameter Display System (SPDS) for Unit 3 of Balakovo NPP.

  • Customer: Armenian NPP
    Armenia, 2010-2013

    Design, development and commissioning of the Remote Shutdown Panel and Post Accident Monitoring System for Armenian NPP, Unit 2.

  • 2012
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2010-2012

    Building management system (BMS) for „Landfill“ facility for short-lived very low level waste Ignalina NPP (B19) (Development, Installation, setup, acceptance testing and commissioning).

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2010-2012

    Temperature and rarefaction control system, Unit 1 INPP -Design, development and commissioning.

  • Customer: Kursk and Kalinin Nuclear Power Plant
    Russia, 2008-2012

    Design, development and commissioning of nuclear material accountancy and control system at Kursk and Kalinin NPPs.

  • Customer: Smolensk Nuclear Power Plant
    Russia, 2007-2012

    Design, development and commissioning of process control system for the new Radwaste Treatment Facility at Smolensk NPP Lot 3.

    EuropeAid/124373/D/SUP/RU

  • 2011
  • Customer:
    Description:
  • Customer: Public company „ORLEN Lietuva“ (Mažeikiai petroleum refinery)
    Lithuania, 2010-2011

    Modernization of control system of pump house № 25 of petroleum refinery Public company „ORLEN Lietuva“. Design, replacement of current controllers to Siemens controllers, programming, mounting, commissioning.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2003-2011

    Development and supply of Computerized Information System and Safety Parameter Display System (SPDS) for Units 1 and 2 of Balakovo NPP.

  • 2010
  • Customer:
    Description:
  • Customer: Balakovo Nuclear Power Plant
    Russia, 2010

    Integration of upgraded protection control system with Computerized Information Computing System (ICS) and of Safety Parameter Display System (SPDS), Balakovo Unit 1.

    Design, development and commissioning.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2010

    Integration of upgraded protection control system with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 2.

    Design, development and commissioning.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2009-2010

    Integration of the in-core control system (ICS) with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 1.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2007-2010

    Ignalina NPP automated radiation monitoring system upgrade.

  • 2009
  • Customer:
    Description:
  • Customer: JSC „GRIGIŠKĖS“
    Lithuania, 2008-2009

    Modernization of JSC „GRIGIŠKĖS“ gas boiler house control system.

  • Customer: Balakovo Nuclear Power Plant
    Russia, 2008-2009

    Integration of the in-core control system (ICS) with Computerized Information Computing System (ICS) and Safety Parameter Display System (SPDS), Balakovo Unit 2.

  • Customer: Balakovo Nuclear Power
    Russia, 2006-2009

    Development and supply of Leakage Monitoring System for Balakovo NPP, Unit 1.

  • 2008
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2008

    Development of information system for nuclear material actual charge (taking into account spent fuel).

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2008

    Development of information system for control of technological channels overload parameters.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2008

    Upgrade of the personal time accounting system “ALGA 2007”.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2007-2008

    Modernization of Safety Parameters Display System, Ignalina NPP, Unit 2.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2006-2008

    Automatization of INPP radiation laboratory. Accounting of radiological measurements and research.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2005-2008

    Development of working time accounting system (DLADUAS).

  • 2007
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2007

    Development of information system for automatic processing of measurement results of reactor's physical and dynamic characteristics.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2007

    Upgrade of software of registration of malfunctions of physical safety system for Ignalina NPP.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2006-2007

    Development and supply of Leakage Monitoring System in sealed rooms for Ignalina NPP Unit 2.

  • Customer: Leningrad Nuclear Power Plant
    Russia, 2003-2007

    Modernization of Simulator, conceptual design of Control Room Panels (CRP), Leningrad NPP.

  • 2006
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2005-2006

    Development of equipment configuration control algorithms and automated system for Ignalina NPP Unit 2.

  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2003-2006

    Design, development and commissioning of Automatic Radiation Safety Monitoring System, Ignalina NPP.

  • 2004
  • Customer:
    Description:
  • Customer: Kalinin Nuclear Power Plant
    Russia, 2002-2004

    Design, development and commissioning of Computerized Information/Safety Panel (CI/SP) system and associated connection to Crisis Centre (local-national), Kalinin NPP, Unit 2.

  • 2003
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2001-2003

    Modernization of the full scope Simulator, Ignalina NPP.

  • 2002
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2000-2002

    Design, development and commissioning Safety Parameters Display System, Ignalina NPP, Unit 2.

  • 2001
  • Customer:
    Description:
  • Customer: Ignalina Nuclear Power Plant
    Lithuania, 2000-2001

    Design, development and commissioning of Computer Information System TITAN, Ignalina NPP, Unit 2.